International Center for Things and Conference



Description of the text presented by architects. CIECC expands the location of the current exhibition in Beijing to more than 611,000 square meters. Providing nine new halls for exhibitions, three reception halls and a conference center for 9,000 delegates and a hotel with 410 rooms. Reduce the manufacturing and standard construction of CIECC from the time of the center’s development, investment and operational costs.



Beijing, a pioneering center for trade, culture and government, has witnessed significant growth in the city’s services and technology industries in the city. This continuous expansion in the sectors of companies in Beijing has increased the demand for the city to host international conferences and conferences and the industry exhibition, which was attended by delegates from all over China and around the world.

In this growth, the center of new international exhibitions and conferences (CIECC) is the largest and most exhibition and conference in Beijing; Expanding the current city facility to more than 611,000 square meters with nine new exhibition halls in addition to three new reception halls, a conference center for 9000 delegates and a hotel with 410 rooms.




It is located on the 15th of the subway network in Beijing inside the Shouoni area in the city adjacent to Capital International Airport. The CIECC axis in the north of the south works as the main conductor among the nine exhibition halls; Providing navigation clarity, maximum flexibility and efficiency, as well as creating a courtyard and a central gathering inside the outdoor events in the open air and landscape gardens.

It is depicted as “strips” weave all new facilities, bridges over this central courtyard, also linking exhibition halls, conference and hotel center, to provide internal blood circulation between events. The Conference Center and the Hotel are located to the north of the site, and a new public square for exhibitions and events. The movement of people, goods and vehicles throughout CIECC is divided into three distinct ways to help blood circulation, providing optimal adaptation and avoiding disruption in various compatible events.

CIECC’s compound ceiling system creates as isolated and lightweight structure that provides column -free spaces that can be quickly adapted to the changes in exhibitions and the nature of use. This standard manufacturing and construction reduces the time of the center’s development, investment and operational costs. The architectural language is designed in the center and the deep copper colors that include large and comfortable windows, to balance the massive industrial scale in CIECC.

By achieving the highest certificate of the Chinese green construction program, the center uses smart buildings management systems with mixed ventilation, ensuring optimal natural ventilation supported by highly efficient HVAC equipment to enhance internal air quality and reduce energy consumption. The collection of rain water throughout the wide imprint of CIECC, the recycling of gray water, and the photovoltaic cells for the power generation on the site will reduce the demand for water and energy from the municipal city supplies.
